<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel xmlns:atom="http://www.w3.org/2005/Atom"><title>Legend Theatrical</title><link>http://www.legendtheatrical.com/blog/rss/feeds</link><description>We offer complete event solutions including staging, lighting, rigging, drapery, audio, video, scenic services and effects. We do everything from straight dry hire to full production services.</description><atom:link href="http://www.legendtheatrical.com/blog/rss/feeds" rel="self" type="application/rss+xml" /><lastBuildDate>Sun, 03 May 2026 22:51:18 -0700</lastBuildDate><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/new-site-launch</guid><link>http://www.legendtheatrical.com/blog/post/new-site-launch</link><title>NEW SITE LAUNCH!</title><description>We have been working hard on developing and launching our new website. We hope you like it! We will keep it much more updated and look forward to keeping it live and fresh. While your here be sure to follow us on twitter or instagram and follow us on Facebook to see the latest info on what we are up to!</description><pubDate>Tue, 27 Oct 2015 20:12:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/the-bay-lights</guid><link>http://www.legendtheatrical.com/blog/post/the-bay-lights</link><title>THE BAY LIGHTS</title><description>The Bay Lights project was one of our largest yet. Legend Theatrical played a crucial role in assembly, and initial testing of the lights.
View a live feed of the lights!
Successful completion of the project required more than a couple of guys with patience and steady hands. We formed a makeshift assembly line in our warehouse specifically for this project. Power distribution and networking was integrated into a large panel and waterproof box provided by Transdyn, and shipped to our warehouse 6 pallets at a time. Our job was to integrate Philips Color Kinetics, eW Flex SLX, LED Node Lighting system, and perform thorough initial testing. More specifically, wiring the LEDs to the provided Philips PDS (power-data supply), and sealing to protect from the not-so-electronics-friendly environment surrounding the Bay Bridge. We also tested and verified function of all lights and IP addresses, as the entire system is network based. Once finished, we shipped out a nice shrink-wrapped and ready to install package for the electricians on the Bay Bridge. Last night they were officially unveiled. Check out the pictures below! Video
Bay Bridge Lighting Project- Legend Theatrical &amp;ndash; YouTube
Photos and video: Bay Bridge will get a coat of 25,000 pulsing LED &amp;hellip;
TheBayLights
Philips Color Kinetics
&amp;lsquo;The Bay Lights&amp;rsquo; Officially Unveiled On Bay Bridge
The Bay Lights Finally Turn On, and the Results Are Fantastic</description><pubDate>Thu, 05 Mar 2015 20:20:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/boulder-creek-fire-department-bbq-and-fundraiser</guid><link>http://www.legendtheatrical.com/blog/post/boulder-creek-fire-department-bbq-and-fundraiser</link><title>BOULDER CREEK FIRE DEPARTMENT BBQ AND FUNDRAISER</title><description>

Legend Theatrical donated labor and gear for the BBQ and dance fundraiser in Boulder Creek, CA. The fundraiser helps to provide Boulder Creek Fire Department with new equipment to protect the homes and people of the community. The Homemade BBQ and full bar was a recipe for good times, along with a live band and dance floor. This event was a win-win for proud local supporters, who had the opportunity to give back, and have a great time.
Space behind the firehouse was limited but used well. Truss canopied the Steeldeck stage and dance floor in the back of the lot. Every inch was used to our advantage. We outfitted the truss with an arsenal of lights including; our new SGM P-5 wash lights and Philips Color Kinetics ColorBlaze TRXs. Control came from a raised booth that held our soundboard and Jands Vista T2 lighting console. Two QSC KLA line arrays reduced conversation to a minimum, while strobe and laser effects amplified guitar solos. Anybody could walk on stage and feel like a rock star.
When the moving heads stopped and the haze from the foggers cleared, the cheers from the crowd reinforced the feeling of accomplishment. Overall the event was very successful. It was great to see such support from the community and to help the men and women who keep them safe. We can&amp;rsquo;t wait to do it again!
Total Gear List:
Lighting/FX-&amp;gt;
24 Color Kinetics ColorBlast TRX (Backlight, Truss Warmers, Sidelight) - 16 Color Kinetics ColorBlaze TRX (Front Light, Blinders) &amp;ndash; 8 Chauvet Colorado2 Tour (Sidelight, Tarp Light) &amp;ndash; 25 ChromaQ Color Blocks (Truss Warmers) &amp;ndash; 2 SGM P-5 (Front Light) &amp;ndash; 1 SGM P-5 TW (Center-Front Light) &amp;ndash; SGM X-5 (Strobe) &amp;ndash; 2 SGM Flasher (Strobe) &amp;ndash; X-Laser X4g (Laser) &amp;ndash; 2 SGM Giotto 400 (On Stage Moving Head) &amp;ndash; 2 SGM Synthesis 700 (Flown Moving Heads) &amp;ndash; 2 Techni-lux Bank 8 (Blinders) &amp;ndash; Rosco Stage Fogger
Sound-&amp;gt;
6 QSC KLA (Flown Front of House PA) &amp;ndash; 2 QSC KW181 (Flown Front of House PA) &amp;ndash; 2 QSC KLA (On Stage Front Fills) &amp;ndash; 2 Meyer Sound 600-HP (Floor Subs) &amp;ndash; 4 QSC K10 (On Stage Monitors)
Control-&amp;gt;
Jands Vista T2 Byron (Lighting Console) - Allan&amp;Heath GL3300 (Sound Console)
Structural-&amp;gt;
20 Show Solutions 8&amp;prime; MDT Truss &amp;ndash; 9 Show Solutions 10&amp;prime; MDT Truss &amp;ndash; 2 Genie Super Towers &amp;ndash; 13 Steeldeck 4&amp;times;8 Decks

</description><pubDate>Thu, 12 Sep 2013 09:50:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/max-final-cut-pacific-rim-promotional-trailer--interviews</guid><link>http://www.legendtheatrical.com/blog/post/max-final-cut-pacific-rim-promotional-trailer--interviews</link><title>MAX FINAL CUT: PACIFIC RIM PROMOTIONAL TRAILER / INTERVIEWS</title><description>Legend Theatrical provided Stage and Truss for a series of interviews with actors from the upcoming movie Pacific Rim.
The Video features interviews with Guillermo Del Toro (Director/Writer) and actors; Ron Perlman, Charlie Hunnam, Charlie Day, and Rinko Kikuchi. In The background our truss structure provides a frame for the banner and support for lights and the actors are sitting on our stage. We provided delivery and labor for setup and removal.
http://www.youtube.com/watch?v=AfjHHs6u_Kg&amp;feature=youtu.be </description><pubDate>Mon, 08 Jul 2013 21:52:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/sgm-gspot-release-announced</guid><link>http://www.legendtheatrical.com/blog/post/sgm-gspot-release-announced</link><title>SGM G-SPOT RELEASE ANNOUNCED</title><description>SGM&amp;rsquo;s much anticipated G-Spot moving head fixture will be unveiled at the 2013 Prolight and Sound expo in Frankfurt this week. This is the first ever IP65 rated moving head, protected against splashing water and completely dust tight.
HURRY AND PRE-ORDER NOW! LIMITED QUANTITIES AVAILABLE!</description><pubDate>Tue, 09 Apr 2013 09:53:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/legend-theatrical-now-official-sgm-lighting-distributor</guid><link>http://www.legendtheatrical.com/blog/post/legend-theatrical-now-official-sgm-lighting-distributor</link><title>LEGEND THEATRICAL NOW OFFICIAL SGM LIGHTING DISTRIBUTOR</title><description>https://www.youtube.com/watch?v=QNf9oDWObYU 
SGM Lighting is sweeping the market with a new line of cutting edge LED products after a full R&amp;D overhaul. Offering lighting for both entertainment and architectural design; these new products are lighter, slimmer, run cooler, and consume less power than the competitor&amp;rsquo;s. SGM has a long history and background in lighting, and presently a leader in design and modern lighting solutions, we see a very bright future with SGM. These new products also give the designer the ability to approach lighting more creatively. Legend Theatrical is now proud to officially distribute these products to you.</description><pubDate>Tue, 09 Apr 2013 09:52:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/further-confusion-2013</guid><link>http://www.legendtheatrical.com/blog/post/further-confusion-2013</link><title>FURTHER CONFUSION 2013</title><description>San Jose Convention Center January 2013, FurCon moves in over the Martin Luther King Jr. weekend for a 4 day convention featuring art, comedy, comics, gaming, costumes and a lot of dancing. Most of our work took place in the 22,000 sq. ft. ballroom, though there was an art room where we installed 4 lighting trees with PARs to illuminate the art work, and a Dealer&amp;rsquo;s room where we provided power to the various dealer&amp;rsquo;s booths.
Load In for the event took 2 days, 4 box trucks, a pickup and a work van. In the Ballroom we provided 64 10&amp;prime; sticks of truss that were hoisted by 20 1/2 ton chain motors to support the lights in two &amp;ldquo;T&amp;rdquo; shapes. We also used truss to support and illuminate large FurCon banners. We provided, in total, 77 conventional lights, 87 color-changing LED fixtures, and 10 moving lights. Lighting coverage included the banners, the dance floor, and the stage. The stage was relatively large utilizing 22 Steeldeck at 44&amp;prime; w x 16&amp;prime; d surrounded by railing, drapes, skirting, and included two sets of stairs. Next to the stage was a 9&amp;prime; x 12&amp;prime; projection screen which displayed I-MAG (video reinforcement) of on stage performances as well as pre-produced video play back relative to the performance. Audio was covered by 4 sets of line arrays; 8 Meyers M1Ds and 8 QSCs KLA12s, and 4 sets of Meyer and QSC subwoofers. We also constructed a 2-level A/V control booth in the back of house where sound was controlled from our Allen and Heath GL-3300 soundboard, and lighting was wirelessly controlled over 3 dmx universes from our Jands Vista T2 lighting console.
Though any experience for us is generally an enjoyable experience, this was especially exciting. While working in the San Jose Convention Center is always a unique experience, the rush of creating an event this diverse within the allowed timeframe and constructing it right is incomparable. We also enjoyed all the great people we met and worked with including members and staff of Further Confusion, IATSE, and the Teamsters. We are already planning for an even bigger and better FurCon 2014!</description><pubDate>Fri, 01 Feb 2013 08:54:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/oneill-coldwater-classic</guid><link>http://www.legendtheatrical.com/blog/post/oneill-coldwater-classic</link><title>O’NEILL COLDWATER CLASSIC</title><description>O&amp;rsquo;Neill Coldwater Classic is back again at Steamer Lane in Santa Cruz, CA for event 9 of 10 in ASP&amp;rsquo;s World Championship Tour. Legend Theatrical is tasked with creating two large structures to accomodate Judges, Surfers, ASP staff, Announcers, and an O&amp;rsquo;Neill retail shop.
The judging and Surfer area is a two story building that stands 64&amp;prime; x 48&amp;prime; wide and 26&amp;prime; high overlooking Steamer Lane from a parking lot on West Cliff Drive . Built mainly out of 12&amp;Prime; truss, the building sits on 48 Steeldeck staging platforms that clear a sidewalk and other obstacles requiring lots of labor and perfectionism. 88 pieces of truss were used in total for the two story building which was tied down by 4 1 ton cement blocks. In order to build a second floor, more Steeldeck is used and customized to clear the 12&amp;Prime; truss and give a clean, flush looking fit on the outside. The exterior is lined with 4,160 Sq. Ft. of custom made banners advertising O&amp;rsquo;Neill and other event sponsors. Stairs and railing are used throughout the structure for safety and accessibility. The roof of the structure is sloped which is achieved by using hinged truss. The retail store is built on the same concept, just on a smaller scale.</description><pubDate>Mon, 10 Dec 2012 08:55:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/meyer-constellation-system-at-valley-christian</guid><link>http://www.legendtheatrical.com/blog/post/meyer-constellation-system-at-valley-christian</link><title>MEYER CONSTELLATION SYSTEM AT VALLEY CHRISTIAN</title><description>Meyer Sound News : Meyer Sound Constellation Makes Practice Perfect at Valley Christian Schoolshttp://www.meyersound.com/news/2012/valley_christian_schools/ 
Earlier this year Legend Theatrical completed a great installation of a Meyer Constellation Sound System at Valley Christian&amp;rsquo;s Conservatory!
&amp;ldquo;I started with Constellation off, and when I turned it on I could see the students&amp;rsquo; eyes just come alive. When we talked afterward, a trumpet player in the back row said, &amp;lsquo;I could never hear the flutes before, but now I can really hear them.&amp;rsquo;&amp;rdquo;
- Troy GunterVice President &amp; Director, Valley Christian Schools&amp;rsquo; Conservatory of the Arts
 </description><pubDate>Thu, 01 Mar 2012 08:57:00 -0700</pubDate></item><item><guid isPermaLink="true">http://www.legendtheatrical.com/blog/post/salvation-army-kroc-center</guid><link>http://www.legendtheatrical.com/blog/post/salvation-army-kroc-center</link><title>SALVATION ARMY KROC CENTER</title><description>We are excited to announce we will be working with Assent Builders &amp; The Salvation Army for the construction of the Ray and Joan Kroc Corps Community Center in Suisun City, CA. Legend will provide complete turn-key installation of the AV, Lighting, &amp; Rigging systems.
This facility will be over 57,000 sq. ft. and with almost every square inch being extensively renovated and many new additions, it will offer state-of-the-art fitness equipment, an aquatic center, indoor gymnasium, dance studio, a party room, classrooms and multi-use community activity areas and even a 300 seat theater!
http://www1.usw.salvationarmy.org/USW/www_usw_suisn.nsf </description><pubDate>Thu, 26 Jan 2012 08:58:00 -0700</pubDate></item></channel></rss>